Search blocks by description or jump to a page.
Four stage dot timeline from payment to door, with the quiet stretch named as the system working.
The source for every Ecommerce block is included with Pro and Team. Start a plan to copy the code.
Already on a plan? Log in
What Happens Next Timeline names the four stages between checkout and the door as a dot progress line, each with its timing and the quiet stretch given its own entry so silence reads as progress. The fourth stage carries the line that does the work: “between dispatch and delivery, no news is the system working. If the tracker sits still for 3 days it escalates to a human by itself, you never have to chase it.”
Stages are one array, each with a state field of done, current, or todo. Naming the quiet stretch as a stage is what turns an absence of news into a credible feature rather than an oversight.
Reach for this block on the order confirmation page or beneath the order tracking panel. The day 3 auto-escalation line must reflect real courier integration or it misleads the buyer.
A natural flow around it on an Ecommerce Pro page:
Before
After
One strong use is the four stage bag journey. Other post order timelines:
Tip: naming the quiet stretch as a stage, not an absence, converts the waiting period from anxiety into evidence the machine is running.