Availability Faq
An availability FAQ that states the real next opening month in the lede and answers five questions about lead time, rush work, waiting list, and start date slippage.
An availability FAQ that states the real next opening month in the lede and answers five questions about lead time, rush work, waiting list, and start date slippage.
The Portfolio Collection unlocks the source for every Portfolio block. All Access unlocks every Collection.
Already purchased? Log in
Availability Faq leads with the real next opening ("August 2026") stated inline in the lede so visitors know where they stand before reading anything else. The five questions cover lead time, how far in advance to reach out (four to six weeks for most projects), rush work (30% premium, honest note about whether the timeline is realistic), the waiting list, and what happens when a start date slips. The rush surcharge is the distinctive detail: a specific percentage and an honest caveat rather than a vague "it depends."
The next opening is a const at the top of the file so the installer changes it in one place and it updates in both the lede and the first accordion answer.
Reach for this block on a contact or hire-me page to replace the generic "get in touch" with actionable booking information. The installer updates the nextOpening const and the booked-through month in the first answer.
A natural flow around it on a Portfolio Pro page:
Before
After
One strong use is the solo freelancer availability page. Other configurations:
Tip: surfacing the next opening in the lede saves every qualified visitor the scroll; they know in three seconds whether the timing works.