# Marketing Roadmap: Feature Journey

A split section with heading, a stat rows panel, and a dated vertical timeline tracing one feature from first request to shipped.

- Page: https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/feature-journey
- Collection: [Marketing](https://www.shadcn-ui-blocks.com/blocks/marketing-pro), Standard tier
- Group: [Roadmap](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections)
- Created: 2026-07-10
- Preview image: https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/feature-journey.png

## Install

```bash
npx shadcn@latest add @shadcn-ui-blocks/marketing-pro-roadmap-sections-feature-journey
```

Needs an API key from a Pro or Team plan: add `@shadcn-ui-blocks` to the registries in components.json with the key as an `Authorization: Bearer` header. Setup: https://www.shadcn-ui-blocks.com/docs/shadcn-cli. The MCP server installs it without the setup: https://www.shadcn-ui-blocks.com/docs/mcp.

## Depends on

- Installs to: `@/components/blocks/marketing-pro/roadmap-sections/feature-journey`

## About this block

Feature Journey traces one real feature from first request to shipped.
A split layout carries a heading, a short story, and a stat panel on
one side, and a dated vertical timeline on the other. Six stages run
down a connecting rule, each with a status disc, a title, a date, and
a line of detail, and the final unshipped stage lights up in primary
so the eye lands on where the work is now.

The stages are one array of date, title, detail, and a done flag that
drives the disc treatment. The stat rows, votes at ship, beta
workspaces, and months from request to release, put numbers behind the
narrative. Telling the story through a single named feature rather
than an abstract funnel is the credibility device, a real history
reads differently from a generic process diagram.

## When to use

Reach for this block when you want to prove your process by walking one
feature through it, rather than describing the process in the abstract.
It pairs the emotional pull of a shipped story with the accountability
of dates, which reassures buyers that requests actually move. It sits
well beside [process-sections](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/process-sections)
where the general method is laid out and this makes it concrete.

A natural flow around it on a Marketing Pro page:

**Before**

- [Process](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/process-sections) sections framing
  the method this story makes real

**After**

- [Roadmap banner](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections) linking the
  live board where the next feature is moving
- [Testimonials](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/testimonials) from the teams who
  requested the feature

## What you can display

One strong use is a marquee feature from request to release. Other
journeys:

- **Bug to fix.** A serious issue from report through patch for a
  status or trust page.
- **Partner onboarding.** A named integration from intake to launch on
  the ecosystem page.
- **Beta to general availability.** A single program through its
  rollout gates.

> Tip: pick a feature people actually asked for, the story only lands
> if the first stage is a request the reader recognizes.

## More in Marketing Roadmap

- [Feature Request Form](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/feature-request-form)
- [Milestone Progress Bars](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/milestone-progress-bars)
- [Prioritization Criteria](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/prioritization-criteria)
- [Public Roadmap Banner](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/public-roadmap-banner)
- [Quarter Timeline](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/quarter-timeline)
- [Roadmap Columns](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/roadmap-columns)
- [Roadmap Table](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/roadmap-table)
- [Roadmap With Votes](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/roadmap-with-votes)
- [Shipped Vs Planned List](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/shipped-vs-planned-list)
- [Voting Board Columns](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/voting-board-columns)
- [Yearly Themes](https://www.shadcn-ui-blocks.com/blocks/marketing-pro/roadmap-sections/yearly-themes)
